Power Requirements

Understanding electrical service requirements for hosting Quanta Pod GPUs

Electrical Service Overview

Quanta Pod GPU systems require adequate electrical service to power high-performance computing equipment. Most properties built after 1980 have sufficient capacity, but understanding your specific requirements is essential for successful installation.

Important Safety Note

All electrical calculations follow NEC (National Electrical Code) safety standards, which require continuous loads to not exceed 80% of circuit capacity.

Minimum Service Requirements

Minimum Required

100A
Max Power: 24 kW
Continuous Load (80%): 19.2 kW
Pod Capacity: Small pod configuration
Home Type: Older/smaller homes

Optimal

400A
Max Power: 96 kW
Continuous Load (80%): 76.8 kW
Pod Capacity: Large pod configuration
Home Type: High-end homes, estates

GPU Pod Power Consumption

Standard Pod Components

GPU Nodes

15-25 kW

High-performance GPUs for computing workloads

Control Systems

0.5-1 kW

Management and monitoring equipment

Networking

0.1-0.2 kW

High-speed internet and local networking

Cooling Systems

8-12 kW

Advanced cooling for optimal performance

Total Power Requirement

25-40 kW

Equivalent to running 3-5 central air conditioning units continuously

Quanta Pod covers 100% of electricity costs

How to Check Your Electrical Service

1

Locate Your Main Panel

Find your home's main electrical panel, usually located in a basement, garage, or utility room. Look for a metal box with a main breaker switch.

2

Check the Main Breaker

The main breaker will be labeled with the amperage rating (e.g., "100", "200", "400"). This number indicates your home's electrical service capacity.

3

Note the Installation Date

Homes built after 1980 typically have adequate service. Older homes may need upgrades, which we can assess during our site evaluation.

4

Professional Assessment

Our certified electricians will perform a complete evaluation during the site visit to confirm capacity and identify any necessary upgrades.

Electrical Service Upgrades

When Upgrades Are Needed

If your current electrical service is insufficient for our GPU pod requirements, we'll work with you to determine the best solution. Upgrades may be necessary for:

  • Homes with 100A service or less
  • Older electrical panels that don't meet current codes
  • Properties where existing capacity is heavily utilized
  • Locations requiring dedicated high-capacity circuits

Service Panel Upgrade

Upgrading from 100A to 200A service to meet pod requirements

Dedicated Circuits

Installing specialized high-capacity circuits for pod equipment

Utility Coordination

Working with your utility company for service capacity increases

Quanta Pod Upgrade Support

In many cases, we can cover electrical upgrades as part of our installation process. We'll discuss upgrade costs and options during your site evaluation to find the most economical solution.

Safety & Code Compliance

NEC Compliance

All installations meet National Electrical Code standards with proper load calculations and safety margins.

Licensed Electricians

All electrical work performed by certified, licensed professionals with extensive commercial experience.

Fire Safety

Built-in fire suppression systems and automatic shutdown procedures protect your property.

24/7 Monitoring

Continuous electrical monitoring with automatic alerts for any anomalies or safety concerns.

Ready to Check Your Electrical Compatibility?

Our experts will assess your property's electrical service and handle any necessary upgrades.